A fresh soil sample is taken if these threads cannot split. This method are going to be repeated with a lot less water In case the threads are not able to crack. It proceeds During this method until eventually, lastly, the thread breaks. The height of the bottom beam https://beausaiqy.loginblogin.com/36244895/the-ultimate-guide-to-pile-foundation-construction-bangladesh